- This episode is going to be more like what I want from future episodes, just exploring a topic.
- With project updates as progress occurs - a garage door update in the shop.
- Reading, I try to read at least some every day.
- I love reading, the use of imagination. While I watch a lot of movies and don't read many books, that's because movies are shorter. It's also easier to multi-task during a movie.
- Reading in school.
- My veracity for reading started in second grade.
- The Occurrence at Owl Creek Bridge.
- I've read a lot of Vonnegut, working through his books now.
- Cormac McCarthy is my favorite author.
- Phillip K. Dick
- Orson Scott Card
- Books I want to read.
Friday, December 28, 2018
167 - Reading
Friday, December 21, 2018
166 - Top TV 2018
- Generation Kill
- Better Call Saul
- Star Trek Continues
- Succession
- Atypical
- Bojack Horseman
- The Haunting of Hill House
- Bodyguard
- Homecoming
- The Shield.
Friday, December 14, 2018
165 - It's Still Electric
- Where to put my 240 volt receptacle.
- If you're doing electrical work, hire an electrician. If you want to risk your safety, this is how I wired my junction box and receptacles.
- Red Dead Redemption 2 - closing in on the end.
- Shop ceiling panels
Friday, December 7, 2018
164 - 240v Electrical Work
- Finalizing details. Will be splitting a 240v circuit to 120.
- I have a subpanel for baseboard heaters. Baseboard heaters no longer exist. Re purposing the breaker to get (2) 120v breakers and I just might add a 240v outlet to the shop for the future.
- Dust collector needs a dedicated circuit
- Tracking down the breaker box diagram
Friday, November 30, 2018
163 - Shop Upgrades
- Cleaning the shop, everything has a layer of sawdust, but the dust collector should fix it.
- Starting with a Harbor Freight DC. Look at the upgrades, options are a Cyclone chip separator, Thein baffle, filter upgrade, Rikon impeller upgrade.
- I'm going to make my own Cyclone, separating chips protects the impeller and keeps the filter clear. The HF filter isn't great, a Wynn filter is more efficient and cpatures more.
- Preparing for the ceiling panels which means I need to install my ceiling mounted receptacles.
- Planning out all receptacles and am going to run them off a dedicated circuit.
- Nanowrimo is almost done and so am I.
- Rants on scooters and entitled drivers.
Friday, November 23, 2018
162 - NaNoWriMo Thanksgiving
- The batting cage has been taken down, it must be Thanksgiving.
- Painting of the shop is done, the ceiling is next. I made a shelf too. The new shop will be organized!
- Watching The Shield while I paint. Watched the last few seasons as they aired after catching up on DVDs. Later watched it all again when I bought the complete DVD set.
- The Shield is one of my favorite shows with The Wire and The X-files. I'm not sure a new show can supplant the shows I first fell in love with like Lost, The sopranos, The West Wing. Those have been favorite for so long, a show I saw last week can't supplant that.
- Last week I watched Bodyguard S1 and Homecoming S1.
- Listening to the podcast of Homecoming, I like the show better.
- NaNoWriMo - scrapped my third screenplay and started a fourth . Outlining is going much better, I'll need more than the 10k words I have left to finish, but I may just finish it anyway.
Friday, November 16, 2018
161 - Shark Jumping
- Shop project update - painting CMU
- Prepping for paint has only reinforced the need for dust collection
- NaNoWriMo Update- Switching up stories to write a romance screenplay. Why not, right?
- A followup on the Kavanaugh claims from last week.